What trainees practise

  • Confirm the line contents and hazards from the P&ID and your SOP
  • Isolate and lock out both upstream and downstream
  • Drain, depressurise and purge the section
  • Verify zero pressure before the first break
  • Wear the right PPE and position yourself out of the line of fire

Every step follows your own SOP and sign-off criteria.

Mistakes the module catches

  • Relying on a single closed valve for isolation
  • Opening without verifying the line is depressurised